meeting_2008-12-10

Meeting with Polderland 10.12.2008

Participants:

  • Peter Beinema
  • Sjur Moshagen

Agenda

  • Since last time
  • Bug status
  • Priority list
  • Next meeting

Since last time

Polderland

  • Mac installer ready for testing
  • InDesign Windows: completed except for removing trace code & final drop Work transferred to non-Frank employee (learning curve issues) - will NOT be finished before friday
  • speech synthesis: we are not going to offer a quote
  • South Sami RFQ: will be dropped today

Divvun

  • still some linguistic bugs to fix, but diminishing
  • M&S answer received - will reply soon
  • working on a cost estimate for speech synthesis - inquiry sent out

Bug status

Solved/cancelled

Nothing new since last time.

To be solved/investigated by Divvun

Div Pld Description
621 xxx other hyphenator bugs. PB: not as much incorrect as well as weird-looking.
630 xxx Word (prefix) with hyphen is rejected - and suggested
652 xxx UPPERCASE-typos only get acronym-suggestions: VARI -> no sugg, vARI -> VÁRI as sugg; consequence of the sugg. mechanism, unresolvable
581 xxx consonant doubling => actual problem is suggestions with hyphens (split compound type); these can be blocked as suggestions, and thus be removed (they would still be recognised, though)

Under investigation by Polderland

Div Pld Description
581 xxx consonant doubling
595 xxx problem with prefix containing hyphens
603 xxx suffix is accepted in the middle of a word
613 xxx speller does not accept 'Ga' tagged word as 2nd part
679 xxx Discretionary/soft hyphen not respected - repaired, repaired code to be dropped

Priority list

  1. to be supplied before 2008-12-12 - Installer for Microsoft Office 2008 / Mac
  2. InDesign proofing tools for Windows - almost completed

Next meeting

Next meeting (16.12.) at 10.00 Dutch/Norwegian time.